The manager of the historic fabric district of Arak Municipality said: In order to preserve and maintain the valuable historic bazaar complex and with the aim of improving the bazaar passages, the improvement and paving operations of the Sheikh al-Islam and Agha Zia al-Din passages of this complex from the Mohseni Street side are underway.
According to the Public Relations and International Affairs Department of Arak Municipality, Hossein Mansouri Zadeh added: Considering the deterioration of the asphalt in the Sheikh al-Islam and Agha Zia al-Din (second and sixth) passages of the historic bazaar from the Mohseni Street side and the inconsistency of the asphalt with the structure of this historic complex, the paving operation of these passages has been placed on the district's agenda.
He further noted: The paving operation of Sheikh al-Islam passage has been completed, and the removal of the asphalt in Agha Zia al-Din passage from the Mohseni Street side has been carried out, and with the participation of the municipality and the electricity department, the removal of the electricity poles in this passage in order to continue the substructure and paving operations is underway.
The manager of the historic fabric district of Arak Municipality concluded by thanking the bazaar merchants and citizens for their cooperation with the municipality in carrying out construction and restoration measures in the Arak historic bazaar complex.

